In just three weeks, a completely new toilet and washing block for the girls was built at the Bweya Children's Home – funded by donations to Zukunft für Bweyas Kinder e.V.
The old toilet had become dilapidated and dangerous for the children. Under expert guidance, the entire old structure was carefully demolished, the old pit emptied and re-dug.
Built to last
On a reinforced foundation of hardcore and solid bricks, a load-bearing concrete slab was laid that can withstand heavy rain. The foundation was in place within the first five days, the walls after about a week. The finished block has five toilet stalls and four washrooms, plus ventilation pipes against odours, new doors and interior and exterior plaster with a coat of paint.
What changes for the girls
Until now the girls had to walk long, risky distances to reach a toilet – especially at night. That is over. The failing facility had also been a reason why officials had threatened to close the home. That worry, too, is gone: the new toilet meets the required standards.
The project in numbers
- Build time
- about 3 weeks
- Scope
- 5 stalls + 4 washrooms
- Material cost
- approx. 12 m UGX (≈ €3,000)
- Funding
- Donations to ZBK e.V.
“Our hearts are full of gratitude for this act of love and care.”Moses, director of Children Safe Uganda
Thank you to everyone who made this project possible – for more safety, dignity and health for the girls in Bweya.